American Edge Lawn Care
5550 Manatee Point Drive
New Port Richey FL 34652
(727) 758-4411
cleancut@americanedgelawncare.com
https://americanedgelawncare.com/
Ali DeGray
19814 Gunn Highway
Odessa FL 33556
| Customer # | 5068 |
| Estimate #: | 0000335 |
| Date: | Oct 16,2026 |
| Description | Qty/Hr | Cost/Rate | Taxes % | Total | |
|---|---|---|---|---|---|
| 19814 Gunn Highway Odessa FL, 33556 | |||||
|
Phase 1 — Pool Area 1.1 Beach zone weed removal, edge & manicure sand back to beach $1,450.00 1.2 Supplemental sand delivery + spread (+ sand at cost if needed) $550.00 1.3 Dead plumeria removal (as necessary, no stump grinding); Sago kept & trimmed (chem-free rehab attempted; survival not guaranteed) $250.00 1.4 Giant Bird of Paradise clumps — keep & manicure (all specimens) $275.00 1.5 Prickly Pear careful harvest + transport to tortoise farm (adjacent 200-acre property) $275.00 1.6 Virginia Creeper vine removal from house wall (chemical-free) $125.00 1.7 Bamboo ground cover cleanup & interior clearing — sized comfortably for future outdoor shower (no thinning of bamboo canopy) [Partner Crew] $375.00 1.8 Pygmy Date Palm cleanup (multiple specimens) — skirt & fronds $325.00 1.9 Trim & shape keep plants (Muhly, Schefflera, Cordyline, Duranta, Clusia, Viburnum/Ligustrum) $475.00 1.10 Old mulch removal — pool area beds (~1,200 sq ft) [Partner Crew] $1,225.00 1.11 New natural mulch install + weed barrier + bed edging (+ mulch at cost) $1,450.00 1.12 Debris haul-off — Phase 1 [Partner Crew] $650.00 1.13 Two evergreen shrubs flanking beach — remove both $475.00 PHASE LABOR TOTAL $7,900.00 25% Deposit $1,975.00 Balance Due on Completion $5,925.00 |
Qty/Hr: 1 | Cost/Rate: $7,900.00 | Taxes %: 0.00 | Total: $7,900.00 | |
|
Phase 2 — Perimeter House, Kennel & East Fence 2.1 Front Entry Bed cleanup (Croton, Plumbago, Schefflera, Standard Ligustrums) $650.00 2.2 Front Circle Island cleanup (bamboo thin, Ligustrum shape, weed, edge) $875.00 2.3 South Side House foundation hedge (Yaupon reshape, Loropetalum rejuvenation) $925.00 2.4 East Fence Line Podocarpus privacy hedge — heavy shape & flat-top $975.00 2.5 Dog Kennel Zone cleanup — vine ID, remove unwanted vines, preserve jasmine $750.00 2.6 Sabal Palm boot cleaning + palm trim (multiple specimens) $385.00 2.7 Hand-pull weed control — all Phase 2 beds (~5,000 sq ft) (chem-free) $650.00 2.8 Old mulch removal — all Phase 2 beds (~1,800 sq ft) [Partner Crew] $1,575.00 2.9 New natural mulch install + bed edging (~1,800 sq ft) (+ mulch at cost) $1,975.00 2.10 Debris haul-off — Phase 2 [Partner Crew] $875.00 PHASE LABOR TOTAL $9,635.00 25% Deposit $2,408.75 Balance Due on Completion $7,226.25 |
Qty/Hr: 1 | Cost/Rate: $9,635.00 | Taxes %: 0.00 | Total: $9,635.00 | |
|
Phase 3 — Gunn Hwy Drive, South Fence & Entrance 3.1 Gunn Hwy Roadside Feature refresh (Flax Lily/Liriope, edge, mulch bed) $475.00 3.2 Entrance Gate Cedars structural shape — restore clearance & sightlines $450.00 3.3 Asparagus Fern INVASIVE species removal (tuberous root dig-out) $375.00 3.4 Entrance Podocarpus hedge formal shape $425.00 3.5 Oak Allée safety crown lift (10-12 oaks, 13.5-14 ft clearance) [Partner Crew] $1,275.00 3.6 South Fence Crepe Myrtle structural prune + mulch rings $575.00 3.7 Old mulch removal — Phase 3 beds [Partner Crew] $795.00 3.8 New natural mulch install + bed edging (+ mulch at cost) $1,150.00 3.9 Debris haul-off — Phase 3 (incl. bagged invasive fern) [Partner Crew] $625.00 PHASE LABOR TOTAL $6,145.00 25% Deposit $1,536.25 Balance Due on Completion $4,608.75 |
Qty/Hr: 1 | Cost/Rate: $6,145.00 | Taxes %: 0.00 | Total: $6,145.00 | |
|
Phase 4 — Lakefront & All Remaining Oaks 4.1 West Side Lake-Edge Oaks (2-3 trees) — skirt lift, deadwood, selective moss [Partner Crew] $875.00 4.2 West Center Oak Cluster — open pond sightline, deadwood [Partner Crew] $975.00 4.3 South-West Fence Line Oak Stand — low skirt lift, dead interior, selective moss [Partner Crew] $825.00 4.4 All Remaining Property Oaks (house, pool, firepit, kennel area) [Partner Crew] $1,250.00 4.5 Ground brush & debris cleanup under all trimmed oaks [Partner Crew] $875.00 4.6 Property-wide Spanish moss load check & selective thin [Partner Crew] $385.00 4.7 Debris haul-off — Phase 4 (large volume) [Partner Crew] $2,350.00 PHASE LABOR TOTAL $7,535.00 25% Deposit $1,883.75 Balance Due on Completion $5,651.25 |
Qty/Hr: 1 | Cost/Rate: $7,535.00 | Taxes %: 0.00 | Total: $7,535.00 | |
|
Notes:
Each phase: ~2 weeks. 25% deposit at phase start, balance due on phase completion. Phase Estimate Breakdown Links: |
|
Estimate & Acceptance
Scope of Work
Property Access & Preparation
Payment
Cancellation & Rescheduling
Weather & Scheduling
Rates
Liability
| Viewed by you | Oct 16,2026 10:16 am | |
| Viewed by you | Oct 16,2026 9:40 am | |
| Viewed by you | Oct 16,2026 9:00 am |